About the role
Konecranes is hiring for the role of Graduate Engineer Trainee, Order Management!
Responsibilities of the Candidate:
- Delivery punctuality 95% -
Production Planning & Control (PPC)
-
Capacity Planning
- Cross-functional Coordination. - ERP tool updating and maintenance. - Maintenance of material master data. - Prepare and manage production plans and schedules to meet customer delivery commitments. - Coordinate with Procurement, Production, Stores, Engineering, and Quality teams to ensure timely material availability and smooth production flow. - Monitor production progress, identify bottlenecks, and implement corrective actions to achieve production targets. - Perform material and capacity planning using ERP/MRP systems while maintaining optimal inventory levels. - Analyze machine, manpower, and resource capacities. - Monitor raw material, WIP (Work-in-Progress), and finished goods inventory - Track production KPIs, prepare planning reports, and drive continuous process improvements to enhance productivity and on-time delivery. - Prioritize production according to delivery commitments. - Monitor daily production progress against the plan. - Maintain Bill of Materials (BOM) and production routing in the ERP system. - Identify opportunities to improve planning accuracy and production efficiency. - Support Lean Manufacturing, Kaizen, and 5S initiatives. - Prepare daily and monthly production reports. - Analyze production variances, bottlenecks, and resource utilization. - Plan fabrication, machining, welding, painting, assembly, and testing activities. - Coordinate long lead-time items such as motors, gearboxes, wire ropes, electrical panels, and structural steel. - Ensure compliance with project timelines for EOT cranes, gantry cranes, jib cranes, and customized lifting equipment.
Education Required: BE Mechanical / BE Electrical
- Professional Experience Required (Max – Min.): 0 to 1 year (Freshers can apply) -
Mandatory Systems Knowledge and Tools Usability:
- ERP systems and its working -
ISO
Requirements
Material Requirement Planning (MRP)
-
-
Competencies and Skills Required:
- Awareness about ISO 9001, 14001, 45001 requirements. - Compliance management. - Communication skills.
-