Skip to content
← All opportunities

Bridge-A-Thon

competitionGandhinagar, Gujarat, India
Apply on Indian Institute of Technology (IIT), Gandhinagar →

Opens the company's own listing — Aspirova never mirrors applications.

Sign in to save
Deadline: 28/10/2026

Opportunity brief

About the Event

Bridgeathon is an engineering design and construction challenge that tests structural ingenuity, creative problem-solving, and practical physics skills. Teams must design and construct a miniature bridge using the materials provided, adhering to specified dimensions. The primary objective is to achieve the highest strength-to-weight ratio by balancing structural efficiency, material usage, and design aesthetics. Put your engineering skills to the test and discover how much load your bridge can withstand before failure!

Date: 1/11/2026

Time: To be announced soon

Event Format & Structure

Phase 1: Construction & Inspection

  • Teams will be provided with standard construction materials, such as popsicle sticks or balsa wood, along with adhesive.
  • Bridges must be constructed within the allotted time and adhere to the specified length, width, and height limits.
  • Completed bridges will undergo dimensional verification and weight measurement before testing.

Phase 2: Load Testing & Evaluation

  • Bridges will be tested using a designated load-testing apparatus.
  • Load will be applied incrementally at the center of each bridge until structural failure or collapse.
  • The maximum load sustained by each bridge will be recorded.
  • The final performance will primarily be evaluated based on the ratio of maximum load supported to the bridge's own weight.

Eligibility & Team Rules

  • Target Audience: Open to undergraduate, postgraduate, and school students from all disciplines.
  • Team Size: 2–4 members per team.
  • Cross-Institution Teams: Participants from different colleges or institutions are allowed.
  • Materials & Equipment: Basic construction materials and testing apparatus will be provided at the venue.
  • Tools: The use of secondary tools, such as cutters, rulers, and markers, will be subject to the guidelines announced before the event.

Rules & Guidelines

  • Material Usage: Only materials provided by the organizers may be used to construct the bridge. External adhesives and unauthorized structural reinforcements are strictly prohibited.
  • Dimensional Constraints: All bridges must comply with the specified span, width, and height limits. Non-compliant structures may incur point deductions or disqualification.
  • Testing Protocol: Load will be applied gradually at the center of the bridge. The maximum load sustained before structural failure or collapse will be recorded.
  • Fair Play: Chemically treating, modifying, or otherwise altering the structural properties of the provided materials outside the permitted event guidelines will result in immediate disqualification.
  • Decision Authority: The decisions of the judges and organizing committee will be final and binding.

Evaluation & Scoring Criteria

  • Strength-to-Weight Ratio (Primary Criterion): Calculated as the maximum load supported divided by the self-weight of the bridge.Efficiency Ratio (E) = Maximum Load Capacity (kg) / Self-Weight of Bridge (kg)
  • Design & Aesthetics: Structural neatness, symmetry, innovation, and overall design quality.
  • Adherence to Constraints: Compliance with the specified dimensions, material restrictions, and event rules.

Rewards & Perks

  • Cash Prizes & Trophies: Exciting rewards for the top 3 winning teams.
  • Certificates of Merit: Awarded to the winners.
  • Certificates of Participation: Provided to all valid competing teams.

Design smart. Build strong. Maximize efficiency. Let your bridge stand the test of load and time!

More like this

Related opportunities